Packages
Sell the whole system, priced off the real job.
Build good, better, and best once from your own catalog. Put one on a proposal and every line prices itself off that job's own numbers: a roof takeoff for a roofer, a counted scope sheet for every other trade.
Package
Architectural system
- Markup
- 25%
- Lines
- 6 catalog items
- Priced off
- This job's takeoff
How the work moves
Build it once. Price it per job.
The package is a reusable definition. Every quantity it produces belongs to the job it was applied to.
- Step 1
Start from your own catalog
A package holds catalog items you already priced. It does not invent a material, a cost, or a supplier.
- Step 2
Say what each line is priced off
Point a line at a roof takeoff quantity or a job scope-sheet quantity, or leave it on the item's own basis. Mark the lines that always ship.
- Step 3
Offer it on a proposal
Pick the package and the measurement. Each line's quantity comes from that job's own numbers, so nothing is re-keyed.
- Step 4
See what it could not price
A line whose quantity the job does not have is listed as skipped, with the reason. So is a line whose cost you have not set yet. Neither is completed with a default.
Package states
What a package is, and what a line can come back as.
A package holds catalog items. What it prices depends on what the job actually measured.
- 01Ready to offerActive, so it can be picked on a proposal. Its markup and warranty travel with it.Selectable
- 02ArchivedOff the picker. Proposals already sent keep the lines and warranty they were sent with.Hidden
- 03Priced lineThe job had the quantity this line is priced off, so the line carries a real number.Measured
- 04Skipped lineThe job has no value for the quantity this line needs, so the line is named and left out rather than guessed.No measurement
Package vs. proposal
A package is a way to price, not a promise.
Next step
Build the system you actually sell.
Sign in, pick the catalog items that ship together, and say what each one is priced off.
Packages price from your catalog and the job's own measurements. They do not order materials.
