Confirm the building. Measure the roof.
On the Permit & Compliance plan, $149 a month. Put the whole crew on it. Nobody pays per person.

A measured result has to earn the label.
Each step leaves its evidence on the job record.
Confirm the right building
Use the job address as a starting point, then confirm the roof scope before analysis begins.
Keep the calibrated capture
Keep the image, where it came from, when it was saved, and the scope you confirmed, together on the job.
Measure from a 3D scan where there is one
Public LiDAR (USGS 3DEP and NOAA Digital Coast) measures the roof in 3D where a usable scan covers it. Where it does not, the takeoff tries the finer 3D roof surface Google Solar publishes for some addresses. It also tries that surface when LiDAR found no inside corners. Where Google has only pitch and area, the lines are sketched from the building outline and the takeoff says so. If nothing answers, you get a footprint estimate, labeled as one.
Review the result, its source, and its gaps
Four things stay apart. What we measured. What we called an estimate. What we could not get. And what you still check in the field.
Draw the roof by hand for the proposal
Trace the roof outline on the aerial photo, press Build roof to lay in the hips, ridges and valleys, move or retype any line, and type the pitch. The takeoff is stamped Hand-traced, never Measured, and a proposal prices from it.
Already paying for roof reports? Bring them here.
A contractor who already buys roof reports should not have to buy the numbers twice to get them onto a job.
The replacement math
Measured reports come with the plan, so a busy month is not a stack of per-roof bills.
- Permit & Compliance: 15 measured reports a month, then $12 for each one after that.
- Operator: 30 measured reports a month, then $9 for each one after that.
Measure 30 roofs in a storm month and, at Operator's own extra-report price, that work would come to $270. On Operator those 30 are already in the plan, and each measurement lands on the job it belongs to.
Start from the address. Keep the evidence attached.
Open the job, confirm the intended building, and review the available measurement path.
Availability depends on the saved scope, feature access, quota, service state, and qualifying public LiDAR coverage. Step by step: Run an aerial takeoff.









