Run an aerial takeoff
Capture the roof from aerial imagery on a roofing job, or import a measured report, then review the quantities before anyone prices work off them.
Roof quantities attached to the job, with their source stated (measured, imported, traced or a public-footprint estimate), so a proposal is priced off something you can point at.
Before you start
- A saved roofing job with a site address
The takeoff lives on a job. Open the exact job and confirm its address before starting imagery work.
- The correct building
You confirm the roof on the imagery yourself, by dragging the map until the crosshair sits on it.
- A field-verification plan
Aerial quantities remain estimates and must be verified before material is ordered.
Follow the task on screen.

- Step 1. Aerial takeoffOpens the capture dialog. You confirm the building on the imagery yourself before anything is captured.
- Step 2. Add or importJumps to the roof-quantity source panel below.
- Step 3. Order a reportOne of four sources, beside Upload / paste report, Trace image and Enter manually.
- 1Not on this screen
Open the job's Roof takeoff section
Open the roofing job and select Measurements in the job's left rail. Roof takeoff is the section it reveals.
You know it worked when The Roof takeoff card appears, showing area, squares and how many reports are attached.
- 2Marker 1 on the screenshot
Capture the roof from imagery
Aerial takeoff opens the capture dialog. Drag the map until the crosshair sits on the roof, set the number of stories, then confirm with This is the roof. Capture.
You know it worked when FL Permit Pay saves the capture against this job and the takeoff card leaves the No takeoff state.
- 3Marker 2 on the screenshot
Or bring a measured report in
Add or import opens the roof-quantity source panel: Upload / paste report for an EagleView, GAF QuickMeasure, Vexcel or Nearmap report, Trace image to mark up a roof image yourself, Order a report, or Enter manually.
You know it worked when The parsed or entered quantities appear on the takeoff card for review.
- 4Not on this screen
Read the numbers before pricing anything
Once a takeoff is received, Review takeoff report opens the full record and Preview takeoff PDF opens the export. Read what the record says about how the numbers were obtained.
You know it worked when The record states its analysis mode. A footprint fallback is labeled as plan area only and does not measure eaves, rakes, ridges, hips, valleys, facets or pitch.
You are finished when
The job's Roof takeoff section shows quantities with their source
Area and squares appear on the takeoff card, labeled with how they were obtained, and Review takeoff report opens the full record.
What still needs your review
- You confirm the building, not the softwareThe capture dialog asks you to drag the map until the crosshair sits on the intended roof, and to say how many stories it is, before it captures anything.
- Footprint fallback is not a measured roofWhen measured analysis is unavailable, FL Permit Pay can fall back to a public building footprint. That is plan area only: it does not classify or measure eaves, rakes, ridges, hips, valleys, facets or pitch, and it is labeled as such on the record.
- Solar Design is separateSolar Design is a preliminary surface and does not change FL Permit Pay roof measurements.
- Verify in the field before orderingEvery aerial quantity is an estimate until someone has been on the roof. Do not order material from it unverified.
If the screen looks different
The workspace can be in any of these states when you arrive. Find the one in front of you.
Confirm the aerial takeoff appears in the workspace before moving on.
Use the page's first-record action when no aerial takeoff exists yet.
Wait for the workspace to finish loading before selecting a record or action.
Use the retry shown on the page. Do not treat an error as an empty record set.
Reconnect before saving. Keep the page open so entered details are not mistaken for a saved record.
Read the availability note and verify any missing source details before acting on them.
Ask an organization owner for the capability named in this guide.
Review the access notice shown in FL Permit Pay before continuing.
Troubleshooting
The job has no Measurements tab or Roof takeoff section.
Roof takeoff is shown for roofing work. Open Edit job and confirm the trade; for a non-roofing trade the equivalent is the scope sheet.
Aerial takeoff is disabled.
Hover the control: it says whether the feature is temporarily unavailable or the plan does not include it. Plan access is compared in Billing.
The takeoff says the proposal is blocked or the scope is not verified.
That is the review holding a generated proposal back. Correct the roof outline, set a verified pitch, or import a measured report, then re-open the record.