Turn measured scope into material quantities for review.
On the Operator plan, $399 a month. Put the whole crew on it. Nobody pays per person.

What the catalog produces
From takeoff to order
Catalog basis, line by line
- 01Architectural shinglesOrganization itemMeasured32.50 SQ1/3 SQ / bundle10% catalogProposal · 98 bundlesOrder · 108 bundlesUnit cost: $40.00Sample Gulf Branch · sheet importReview inputs
- 02Drip edge, eavesOrganization itemMeasured140 LF10 LF / piece5% catalogProposal · 14 piecesOrder · 15 piecesUnit cost: $12.00Sample local branch · manualReview source
- 03Ridge vent, 4 ftStarter copiedMeasured30 LF4 LF / piece5% catalogProposal · 8 piecesOrder · 8 piecesUnit cost: $22.00Unassigned · manualAdd supplier
- 04Pipe bootOrganization itemMeasured7 penetrations1 each0% catalogProposal · 7 eachOrder · 7 eachUnit cost: $15.00Sample Gulf Branch · sheet importReview source
From your catalog to an order somebody sends.
- 01
Copy or create, then set the math
Copy a starter item or make your own. Then set the unit, the coverage, the waste, the cost, and where the price came from.
- 02
See which costs you can quote from
The price book sits on shelves by material family. Every material shows its cost per unit and a plain label: priced, no cost yet, or a supplier price sheet carries a new cost your book has not taken. Four counts at the top say how much of the book is ready, and each one filters the shelves to it.
- 03
Search ABC Supply's catalog
Your own price book, plus ABC Supply's catalog at your branch's prices once your ABC account is connected. Each row shows the photo, the branch, and the unit price. Add one and edit it right there, or tick several and add them all at once.
- 04
Fill the proposal, then carry it onto the job
Finish a measurement and it fills in the proposal and the order counts. The estimator checks them. When a customer accepts, the material lines can start the job's material list, but only while that list is still empty. Labor lines stay out.
- 05
Check the branch price, then order by supplier
Connect ABC Supply and pick your branch. The job can then ask that branch what it charges today for the lines you have not bought yet, and show you which are cheaper. It compares and stops. Nothing is ordered. A line priced in a different unit is left out, never guessed at. Sign a proposal and one tap builds the order list, with one purchase order draft per supplier.
What is on, and what is off.
Your catalog + starter copy
Coverage basis, waste, cost, source, SKU, supplier, active state, and roof-system templates.
Measurement-backed proposals
Catalog and assembly lines work out the proposal count, the order count, the cost, the sell price and the margin. You review all of it.
Job conversion + order list
A converted job picks up the catalog lines that qualify. Lines you type by hand still work. A signed proposal drafts one PO per supplier; staff check each against the branch, send it, and log responses.
Distributor search + account pricing
On for ABC Supply wherever you connect an account. You get one search list with photos and branch pricing, and you can pull one result or many into the price book. QXO is in testing, and contractors cannot use it yet. SRS isn’t built yet.
API order submission
Off. A person builds and shares a PO draft. No account anywhere places an order for you. Sending an order to ABC Supply isn’t built yet.
Keep the material math attached to its source.
Price jobs from your own catalog and see which material lines carry over to the job.








