
Fence and outdoor · Sarasota, Florida
We build to the survey rather than the neighbor's assumption, and we tell you up front if the HOA is going to want drawings.
Recent work, photographed on the job.
Drag, or use the arrows
The same elevation, photographed on two dates.



We set posts in concrete, lay pavers on a compacted base, and pour slabs that do not spider-crack in the first summer. None of that is glamorous and all of it is why the work is still straight in five years.
Property lines matter here. We work to the survey rather than to the neighbor's assumption, and we tell you before we build if what you want needs a variance.
One crew, one permit, one company you can reach when something needs adjusting.
Work we take across Sarasota, Manatee. If it is not on this list we will tell you who does it properly.
Set in concrete, laid out to the survey.
Pressure-treated posts and pickets, gates included.
Compacted base, edge restraint, polymeric sand.
Poured concrete, reinforced, cut to control cracking.
Engineered where the grade requires it.
Manual and automated, sized for a vehicle.
The same people who quote the job are on it.

A fence line is the first thing you see. We set every post like it is the front one.

Pavers move if the base is wrong. We over-build the base every single time.

They found the HOA setback before we did and moved the line two feet. Saved us a fight.
Sample review, Priya · Lakewood RanchThree years and not one paver has settled. They spent a whole day just on the base.
Sample review, Tom · VenicePermit, inspection, and the barrier certificate handled without me making a single call.
Sample review, Denise · BradentonSurvey checked and the permit pulled before the first post goes in the ground.
License SAMPLE-LICENSE-NUMBER, checked against state records on 2026-07-20